Analisis Perubahan Desain Box Culvert pada Jembatan Penghubung: Studi Kasus Proyek Pelabuhan Terminal Teluk Lamong
Keywords:
Box culvert, Design changes, Connecting Bridge, Construction, Port projectAbstract
This study aims to analyze changes in the box culvert design for the connecting bridge project in the Teluk Lamong Port Terminal area and to identify the considerations underlying those changes. The study employed a case study method with a qualitative descriptive approach. Research data were obtained through a review of the initial and revised designs, procurement documents, project documentation, and information from weekly meetings involving the contractor, project owner, and planning and supervision consultants. The results indicate that the box culvert configuration was changed from two units placed side by side to a single unit. In addition to the change in the number of units, there was an adjustment in dimensions from 400 cm in the initial design to procurement specifications for a box culvert measuring 300x200x120 cm with a wall thickness of 50 cm and K-350 concrete strength. The revised design also showed the addition of flanges on the sides of the box culvert as a change in construction details. The design change from two box culvert units to a single unit in the connecting bridge project was made to accommodate the conditions and requirements of the project’s implementation. Based on observations, interviews, and project documentation, this change was influenced by considerations regarding site conditions, ease of implementation, and technical design aspects. The use of a single unit with a revised design is deemed capable of meeting the project’s needs while simplifying the construction process
Downloads
References
Abuhajar, O., El Naggar, H., & Newson, T. (2015). Static soil culvert interaction the effect of box culvert geometric configurations and soil properties. Computers and Geotechnics, 69, 219–235. https://doi.org/10.1016/j.compgeo.2015.05.005
Aslam, M., Baffoe-Twum, E., & Saleem, F. (2019). Design Changes in Construction Projects – Causes and Impact on the Cost. Civil Engineering Journal (Iran), 5(7), 1647–1655. https://doi.org/10.28991/cej-2019-03091360
Dewi, I. G. A. W. K., & Pramana, I. M. W. (2023). Pengaruh Change Order Terhadap Biaya dan Waktu pada Proyek Konstruksi di Kota Denpasar. Seminar Nasional Ketekniksipilan, 2, 324–335.
Febryanto, D. (2024). Faktor-faktor Yang Mempengaruhi Keterlambatan Proyek Pembangunan Box Culvert Jembatan Jalan Sudirman dan Jalan Agussalim Kecamatan Bangkinang Kota. 4(1), 72–77.
Hao, Qi, Shen Weiming, Neelamkavil, Joseph, Thomas, R. (2008). Change Management in Construction Projects.
Irwanto, R. (2022). International Journal of Civil Engineering and Infrastructure. 2(1), 70–87.
Johari, G. J., & Zain, A. M. (2025). Evaluasi dampak Perubahan Desain Terhadap Biaya dan Waktu Proyek Konstruksi Menggunakan Metode Earned Value Analysis. Jurnal Konstruksi, 23(2), 310–316. https://doi.org/10.33364/konstruksi/v.23-2.2060
Kerzia Arauzu, A., Yasada, G., & Sukarmawati, Y. (2025). Analisis Contract Change Order Terhadap Waktu Dan Biaya Pada Proyek Pembangunan Gedung Smpn 7 Mengwi Di Kabupaten Badung. 4, 93–104.
Muhamad, N. H., & Mohammad, M. F. (2018). Impact of Design Changes in Contruction Project. Malaysian Journal of Sustainable Environment, 1–18.
Naveed, M., & Waqas, H. A. (2022). Design Optimization of Precast Reinforced Box Culvert with the Application of Finite Element Modeling and Analysis. 1st International Conference on Advances in Civil & Environmental Engineering, University of Engineering & Technology Taxila, Pakistan, 1–5.
Nurjaman, A., & Johari, G. J. (2026). Evaluasi Dampak Change Order terhadap Biaya dan Waktu menggunakan Metode EVM. Jurnal Konstruksi, 24(1), 965–973. https://doi.org/10.33364/konstruksi/v.24-1.2737
Putra, H. E., & Sulistio, H. (2020). Pengaruh Change Order Terhadap Biaya, Mutu, Dan Waktu Pada Proyek Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(4), 1349. https://doi.org/10.24912/jmts.v3i4.8233
Sandyavitri, A. (2008). Terhadap Waktu Dan Biaya Pekerjaan Konstruksi. Jurnal Teknik Sipil, 9(i), 57–70.
Taher, A., Khan, R. A., & Khan, M. A. (2025). Construction project change management in Indian construction industry: status, importance and impact. Journal of Engineering and Applied Science, 72(1), 1–24. https://doi.org/10.1186/s44147-025-00605-z
Yunisari, Melisa, Usman sumaga, Arfan, U. A. (2003). Analisis Faktor Akibat Perubahan Desain Yang Mempengaruhi Biaya, Waktu dan Mutu Pada Proyek Konstruksi. Journal of Child Health Care, 7(2), 132–139. https://doi.org/https://doi.org/10.1177/1367493503007002009
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Muhammad Irkhammudin Al Ma'ruf, Efa Suriani

This work is licensed under a Creative Commons Attribution 4.0 International License.